UST Henry Sy Sr. Hall

Home   |   UST Henry Sy Sr. Hall
UST Henry Sy Sr. HallUST Campus, Manila
Engagement: Construction Managers and Quantity SurveyorSector: Institutional
  • The new building is a simulation and research facility dedicated to supporting the University of Santo Tomas (UST) Faculty of Medicine.
  • Gross Floor Area (GFA) of the building exceeds 8,000 sqm.
  • It is designed to house state-of-the-art and cutting-edge medical equipment.
  • The facility consists of a total of seven levels, including a roof deck.
  • The construction incorporates bored piling works for strong and stable foundations.
  • The total cost of the project is estimated to be around PHP 800 million, not including Owner Supplied Materials (OSM) and Owner Supplied Equipment (OSE).
  • The construction is currently completing the Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) and Fit-Out works.
  • Inauguration of the project was held last September 2024
Transparent orange JCVA logo shape

Ready to achieve success like these projects?

We manage risks, build strong stakeholder relationships, and deliver solutions that reflect global best practices, backed by deep local industry knowledge.

If you're looking for a reliable partner to bring your vision to life, JCVA is here to build it with you.

JCVA & Associates Project Management and Development - Footer Logo
JCVA specializes in providing tailor-fit construction project management solutions to businesses in need of expeditious and cost-effective means to achieve business goals.
Contact Info
   GF & 6F, Avire Tower, 27 P. Tuazon Boulevard cor. Lakandula Street., Brgy. Marilag, Q.C. 1109, Philippines
© Copyright 2025 - JCVA. All Rights Reserved